${{amount}} USD

my cart

Free Shipping On world wide

  • HOME
  • PRODUCTS
  • IN THE NEWS
  • SPECTRUM BLOG
  • WEB SPECTRUM VIEWER

FCC Announcements

FCC TAKES STEPS TO TRANSFORM THE 2.5 GHZ BAND FOR NEXT GENERATION 5G CONNECTIVITY. Fri, May 11, 2018

 FCC TAKES STEPS TO TRANSFORM THE 2.5 GHZ BAND FOR NEXT GENERATION 5G CONNECTIVITY.  News Release. (Dkt No 18-20 ). 
https://apps.fcc.gov/edocs_public/attachmatch/DOC-350646A1.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-350646A2.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-350646A3.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-350646A4.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-350646A5.pdf


WIRELESS TELECOMMUNICATIONS BUREAUS SEEK COMMENT FOR REPORT ON THE FEASIBILITYOF ALLOWING COMMERCIAL WIRELESS SERVCIES, LICENCSED OR UNLICENSE, TO USE OR SHARE USE OF THE FREQUENCIES BETWEEN 3.7-4.2 Tue, May 01, 2018

OFFICE OF ENGINEERING AND TECHNOLOGY, INTERNATIONAL, AND WIRELESS TELECOMMUNICATIONS BUREAUS SEEK COMMENT FOR REPORT ON THE FEASIBILITYOF ALLOWING COMMERCIAL WIRELESS SERVCIES, LICENCSED OR UNLICENSE, TO USE OR SHARE USE OF THE FREQUENCIES BETWEEN 3.7-4.2. (DA No.  18-446). (Dkt No 18-122 ). 
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-446A1.pdf

EXPANDING FLEXIBLE USE OF THE 3.7 GHZ TO 4.2 GHZ BAND - WIRELESS TELECOMMUNICATIONS BUREAU, INTERNATIONAL BUREAU, AND OFFICE OF ENGINEERING AND TECHNOLOGY ESTABLISH GN DOCKET NO. 18-122. Thu, Apr 19, 2018

(DA No.  18-396). (Dkt No 18-122 )  By this Public Notice, the Wireless Telecommunications Bureau, International Bureau, and the Office of Engineering and Technology establish GN Docket No. 18-122, which is captioned "Expanding Flexible Use of the 3.7 GHz to 4.2 GHz Band.".  OET IB WTB . 


https://apps.fcc.gov/edocs_public/attachmatch/DA-18-396A1.pdf


WIRELESS TELECOMMUNICATIONS BUREAU OPENS WT DOCKET NO. 18-120. “Transforming the 2.5 GHz Band.” Thu, Apr 19, 2018

https://apps.fcc.gov/edocs_public/attachmatch/DA-18-394A1.pdf

AUCTIONS OF UPPER MICROWAVE FLEXIBLE USE LICENSES FOR NEXT-GENERATION WIRELESS SERVICES; COMMENT SOUGHT ON COMPETITIVE BIDDING PROCEDURES FOR AUCTIONS 101 (28 GHZ) AND 102 (24 GHZ) Wed, Apr 18, 2018

BIDDING IN AUCTION 101 SCHEDULED TO BEGIN NOVEMBER 14, 2018. (Dkt No 18-85 )  Proposes and seeks comment on application and bidding procedures for auctions for the 28 GHz and 24 GHz bands. Comments Due:  05/09/2018. Reply Comments Due:  05/23/2018. (FCC No. 18-43).  


https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-43A1.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-43A2.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-43A3.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-43A4.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-43A5.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-43A6.pdf


FCC SETTLES WITH SPRINT & MOBILITIE FOR $11.6 MILLION REGARDING WIRELESS STRUCTURES BUILT WITHOUT REQUIRED REVIEW. Tue, Apr 10, 2018

 FCC Settles with Sprint & Mobilitie for $11.6 Million.  
https://apps.fcc.gov/edocs_public/attachmatch/DOC-350129A1.pdf

VERIZON-STRAIGHT PATH TRANSACTION STAY DENIAL ORDER. Mon, Apr 02, 2018

Order denying petition for stay of order granting consent to transfer control of millimeter wave licenses from Straight Path to Verizon. Action by:  Chief, Wireless Telecommunications Bureau. Adopted:  04/02/2018 by ORDER. (DA No. 18-328).  WTB  
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-328A1.pdf

ACCELERATING WIRELESS BROADBAND DEPLOYMENT BY REMOVING BARRIERS TO INFRASTRUCTURE INVESTMENT, SECOND REPORT AND ORDER. Fri, Mar 30, 2018

FCC Acts to Speed Deployment of Next-Gen Wireless Infrastructure. (Dkt No.  17-79 ). Action by:  the Commission. Adopted:  03/22/2018 by R&O. (FCC No. 18-30).  
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-30A1.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-30A2.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-30A3.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-30A4.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-30A5.pdf
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-30A6.pdf

WIRELESS TELECOMMUNICATIONS BUREAU SEEKS COMMENT ON AT&T REQUEST FOR WAIVER OF GEOGRAPHIC COVERAGE REQUIREMENT FOR 700 MHZ LICENSE IN ALASKA. Wed, Mar 28, 2018

(DA No.  18-314). (Dkt No 18-67 ). Comments Due:  04/30/2018. Reply Comments Due:  05/15/2018. 
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-314A1.pdf

FCC ACTS TO FACILITATE DEPLOYMENT OF 5G AND WIRELESS BROADBAND INFRASTRUCTURE. Thu, Mar 22, 2018

News Release. (Dkt No 17-79 ). Adopted:  03/22/2018. 
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349845A1.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349845A2.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349845A3.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349845A4.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349845A5.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349845A6.pdf

FCC PROPOSES TO OPEN SPECTRUM HORIZONS FOR NEW SERVICES & TECHNOLOGIES Thu, Mar 01, 2018

Seek comment on proposed rules that would apply to spectrum above 95 GHz for licensed services, unlicensed operations, and a new class of experimental licenses, and that addresses several petitions and requests relating to these frequencies. (Dkt No.  RM-11795 RM-11713 18-21 15-245 ). (FCC No. 18-17).  
https://apps.fcc.gov/edocs_public/attachmatch/FCC-18-17A1.pdf

FCC PROPOSES TO OPEN 'SPECTRUM HORIZONS' ABOVE 95 GHZ FOR NEW SERVICES AND TECHNOLOGIES. Fri, Feb 23, 2018

News Release. (Dkt No RM-11795 RM-11713 18-21 15-245 ). 
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349378A1.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349378A2.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349378A3.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349378A4.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349378A5.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DOC-349378A6.pdf

WIRELESS TELECOMMUNICATIONS BUREAU AND OFFICE OF ENGINEERING AND TECHNOLOGY CONDITIONALLY APPROVE FOUR ENVIRONMENTAL SENSING CAPABILITY OPERATORS FOR THE 3.5 GHZ BAND. (DA No. 18-172) Thu, Feb 22, 2018

https://apps.fcc.gov/edocs_public/attachmatch/DA-18-172A1.pdf

WIRELESS TELECOMMUNICATIONS BUREAU GRANTS AWS-3 LICENSES IN THE 1695-1710 MHZ, 1755-1780 MHZ AND 2155-2180 MHZ BANDS. Wed, Feb 21, 2018

(DA No.  18-166).
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-166A2.xlsx
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-166A1.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-166A2.pdf

APPLICATION OF AT&T MOBILITY SPECTRUM LLC AND FIBERTOWER CORPORATION FOR CONSENT TO TRANSFER CONTROL OF 39 GHZ LICENSES. Thu, Feb 08, 2018

Order granting consent to transfer control of millimeter wave licenses from FiberTower to AT&T. Action by:  Chief, Wireless Telecommunications Bureau. Adopted:  02/08/2018 by MO&O. (DA No. 18-125).  
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-125A1.pdf

Auction No. 1002 Released: 01/30/2018. INCENTIVE AUCTION TASK FORCE AND WIRELESS TELECOMMUNICATIONS BUREAU GRANT 600 MHZ LICENSES. (DA No. 18-66) Tue, Jan 30, 2018

https://apps.fcc.gov/edocs_public/attachmatch/DA-18-66A2.xlsx
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-66A3.xlsx
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-66A1.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-66A2.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-66A3.pdf

FIBERTOWER SPECTRUM HOLDINGS LLC. Grants FiberTower's request for a limited waiver of the June 1, 2012 substantial service deadline applicable to the certain 39 GHz licenses Mon, Jan 29, 2018

FIBERTOWER SPECTRUM HOLDINGS LLC.   Grants FiberTower's request for a limited waiver of the June 1, 2012 substantial service deadline applicable to the certain 39 GHz licenses and takes other actions to implement a settlement agreement between FiberTower Spectrum Holdings, LLC (FiberTower).

Action by:  Deputy Chief, Broadband Division, Wireless Telecommunications Bureau. Adopted:  01/26/2018 by Order on Remand. (DA No. 18-78).  
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-78A2.xlsx
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-78A3.xlsx
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-78A4.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-78A5.xlsx
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-78A1.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-78A2.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-78A3.pdf
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-78A5.pdf


WIRELESS TELECOMMUNICATIONS BUREAU ESTABLISHES PROCEDURES TO AFFORD NORTHSTAR WIRELESS AND SNR WIRELESS LICENSECO THE OPPORTUNITY TO CURE THEIR AUCTION 97 APPLICATIONS. Thu, Jan 25, 2018

Order on Remand establishing procedures to afford Northstar Wireless and SNR Wireless LicenseCo the opportunity to cure their Auction 97 applications. Action by:  By the Chief, Wireless Telecommunications Bureau. Adopted:  01/24/2018 by Order on Remand. (DA No. 18-70).
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-70A1.pdf

APPLICATION OF VERIZON COMMUNICATIONS INC. AND STRAIGHT PATH COMMUNICATIONS, INC. FOR CONSENT TO TRANSFER CONTROL OF LOCAL MULTIPOINT DISTRIBUTION SERVICE, 39 GHZ, COMMON CARRIER POINT-TO-POINT MICROWAVE, AND 3650-3700 MHZ SERVICE LICENSES Thu, Jan 18, 2018

Order granting consent to transfer control of millimeter wave licenses from Straight Path to Verizon. Action by:  Chief, Wireless Telecommunications Bureau. Adopted:  01/17/2018 by MO&O. (DA No. 18-52).
https://apps.fcc.gov/edocs_public/attachmatch/DA-18-52A1.pdf

INCENTIVE AUCTION TASK FORCE AND MEDIA BUREAU GRANT WAIVER OF THE POST-AUCTION TRANSITION SCHEDULE AND MODIFY THE TRANSITION PHASE ASSIGNMENTS OF REPACKED STATIONS IN PUERTO RICO AND THE U.S. VIRGIN ISLANDS. (DA No. 18-35). (Dkt No 12-268 16-306 ) Fri, Jan 12, 2018

https://apps.fcc.gov/edocs_public/attachmatch/DA-18-35A1.pdf

my wishlist